Sienna Construction Updates

What You Need To Know About Our New Home

See the Future (Renderings)Photo GalleryParking OptionsLatest Updates

GO HERE FOR LATEST CONSTRUCTION UPDATES AND THEIR IMPACT!

Our Sienna Campus is located in one of the most diverse counties in the United States and in one of the top-selling master planned communities in the nation, too. As we seek to serve the growing area, Houston's First is preparing for the future by expanding our facility in our prime location thanks to the generosity of our church family toward our two-year Kainos initiative.

  • We launched our Sienna Campus in 2013 in rented space in a retail shopping center. The space where we gathered for worship services held fewer than 100 people at the time, and our Life Bible Studies met in rooms we rented from other tenants in the building.
  • In 2014, we were able to purchase the shopping center and build out a dedicated Worship Center and Life Bible Study classrooms for all ages thanks to the generosity of the Houston’s First family.
  • We moved from two to three Sunday worship services in 2019 to accommodate all of the new people who were coming to make Houston's First their home.

Our New Facility

The Sienna Campus facility will expand from approximately 21,000 square feet to around 74,000 square feet, including a Worship Center with 9,300 square feet and seating for at least 600 worshippers. That is more than three times the size of our current Worship Center with 2,759 square feet and seating for just 202 people.

This new home of our Sienna Campus will also include:

  • Large main foyer with dedicated hospitality space
  • Covered walkway connecting new and current building
  • Children’s space with nine Life Bible Study classrooms, two large rooms for worship and other activities
  • Preschool space with 14 rooms, a large worship space, and a nursing mothers’ room
  • Indoor playground
  • Outdoor artificial turf space
  • Office space for staff members
  • 100 new parking spaces

Our existing facility will continue to be used for Student and Adult ministry activities. Adults will have seven Life Bible Study classrooms, and Students will have eight breakout rooms, a gathering/pre-function area, and a large worship space.

See The Future

These animated tours and renderings provide a look at our new Sienna Campus facility!

Aerial Tour

Interior Tour

Renderings






















Here are scenes from our Sienna Campus as construction is underway on our new facility at 4309 Sienna Parkway. We invite you to visit on a Sunday to see the progress in person!

Parking Options

Refer to the map below for Sunday parking options. On weekdays and Saturdays, you are welcome to park in our South or North parking lots.

SHUTTLE PARKING

  • Sienna Professional Plaza (blue)
  • Houston's First — South Lot (yellow)

SELF-PARKING

  • Annex Lot (purple)
  • Kids 'R' Kids (maroon)
  • Sienna Animal Hospital (orange) — for preschool families
  • Houston's First — North Lot (black) — for first-time guests, expectant moms, and limited mobility



Latest Updates

EFFECTIVE THU, APR 18

Here's what you need to know:

Sanctuary/Worship Space:

  • Clouds – Sheetrock installed.
  • Back of house - plumbing and gas test completed.
  • Masonry wall complete.
  • Pastoral office – tape and float.
  • Connection Center/Coffee Bar – Sheetrock installation underway.
  • Indoor Playground – Hang clouds and install floor box.
  • A/C installation scheduled.

NextGen/Education Space:

1st Floor

  • Continued cabinetry work.
  • Continued tile installation – restrooms.
  • Paint 1st coat.
  • Ceiling grid is in.

2nd Floor

  • Continue sheetrock.
  • Ceramic tile installation continues.
  • Install ceiling grid.

Exterior:

  • New temporary stairwells have been added to existing building. South entrance to existing building has been closed.
  • Pathway to elevator has been closed. Patrons will have to be escorted through facility in order to use elevator.
  • New monument sign is being constructed at corner of Sienna Ranch Rd & Sienna Pkwy.
  • Sidewalk concrete pour scheduled.
  • Irrigations system installation underway on Sienna Circle Rd.

On April 14, we held our “Foundation of Prayer”. This time was dedicated to laying a foundation of prayer on the floors of the new facility by writing on the foundation the names of loves ones, neighbors and friends we are praying to receive Christ. In addition, we had a tour of the new facility.

      Estimated completion date: Summer 2024